Please use this identifier to cite or link to this item: http://localhost:80/xmlui/handle/123456789/6589
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2022-08-26T05:24:22Z-
dc.date.available2022-08-26T05:24:22Z-
dc.date.issued2022-06-
dc.identifier.urihttp://172.16.0.4:8085/heritage/handle/123456789/6589-
dc.language.isoenen_US
dc.publisherAccess Intelligenceen_US
dc.relation.ispartofseriesVolume 166;Number 6-
dc.subjectPOWERen_US
dc.subject2022en_US
dc.subjectJuneen_US
dc.subjectVermont and ISO-New England Provide an Interestin Renewable EnergyTransition Case Studyen_US
dc.subjectMorocco Project Could Support UK's Renewable Goals, Hydrogen Economyen_US
dc.subjectTHE big picture: Oil and Gas Investment in clean energyen_US
dc.subjectNuclear-Hydrogen, CCUS part of at least 42 Country Ambitions power digesten_US
dc.subjectAutomating Control of Work: What Power and Utilities Leaders Need to Knowen_US
dc.subjectMaximizing Surety to Power Up New Renewable Energy Projects By Karl Choltus, Brown & Brownen_US
dc.subjectCOVER FOCUS: TRANSMISSION & DISTRIBUTIONen_US
dc.subjectCOMMERCIAL & INDUSTRIAL POWER . Reliability, Resiliency,Cost, and Climate Driving C&I Power Systems 20 Businesses, college campuses, healthcare facilities, and other commercial and industrial sites are increasingly turning to onsite power generation as they work to control energy costs, and ensure a more reliable and resilient supply of electricity.en_US
dc.subjectPLANT DECOMMISSIONING New Life for Dead and Dying Coal Plants? 24 Real estate is valuable, and the sites of retired coal plants are no exception. Plants have valuable materials that can be recycled, and there are instances where demolition is not needed-the buildings can be repurposed, includ ing using infrastructure to support new generation resources, or even as commercial space.en_US
dc.subjectPLANT SUPPLIES Gaskets and Fasteners:What Sets a Supplier Apart? 28 Gaskets and fasteners may seem like mundane power plant items, but if you don't have the one you need to get your unit back online, that pocket-change item could end up costing your company thousands of dollars in lost produc tivity. Having the right supplier could be aen_US
dc.subjectSOLAR POWER Solar Power Plant Maintenance with Thermal UAV InspectionTechnology 30 Unmanned aerial vehicles (UAVs) save time and make completing inspec tions far easier and safer than performing the task with hand-held devices. With dual-camera attachments, inspectors can feel confident that no real anomalies will be missed and that false indications can be quickly identified and rejected.en_US
dc.subjectMARNIE SURFACEBLOW What Is KillingThis Biomass Boiler? Marnie and Maya Are on the Case! 36 When a Louisiana power plant with a stoker furnace designed to burn sugar cane waste adds poultry litter to its fuel supply, slag becomes a problem. Marnie and Maya investigen_US
dc.subjectPLANT FLEXIBILITY Optimizing Power Plant Load Flexibility 40 Managing the variability of renewable energy resources is of increasing im portance to traditional power generators. Implementing field-proven control solutions provides a way to mitigate impacts on efficiency and reliability.en_US
dc.subjectElECTRICAL Commissioning and AcceptanceTestingAre the Foundation for Total Electrical System LifecycleManagement Web To manage the challenges of today's complex electrical power systems and tightening budgets, facility managers need to understand the critical connec tion between electrical commissioning and acceptance testing, and planning for lifecycle management. This article reviews the scope of services required for each stage of the process. (Visit powermag.com and search "Total Electri cal System Lifecycle Management" to read this onlineen_US
dc.subjectPage-44-COMMENTARY Energy Security = National Security: How the West Needs to Reindustrialize, Rethink Energy Policy By Craig Golinowski, Carbon Infrastructure Partneren_US
dc.titlePOWERen_US
dc.typeImageen_US
Appears in Collections:Alerting of New Journals (BT)

Files in This Item:
File Description SizeFormat 
Power Jue-2022.pdf3.37 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.